Accessibility Statement
Skip Navigation
The list is built around four long-weekend scenes—Yard, Garage, Deck and Tailgate—informed by VEVOR’s survey findings and the seasonal context of the Labor Day weekend. New survey data show that among 265 respondents who identified specific project areas, 48% selected lawn, yard or garden work, while 35% selected outdoor cooking or entertaining areas.
These real-world project needs give VEVOR a starting point for curating a focused selection of tools and equipment to help Home Creators get the job done.
How the Picks Were Chosen
Power Picks starts with the project, not the product. For the Labor Day Edition, VEVOR first looked at the types of projects consumers are planning to tackle, then narrowed its product selection based on practical performance, ease of use, value and real-world customer feedback.
Each featured pick has a specific reason for making the list—from a standout price or strong performance to a simpler way of getting a common job done. The result is a deliberately limited selection designed to help Home Creators spend less time comparing products and more time getting started.
Yard, before fall
With 48% of Labor Day project planners planning to work on their lawn, yard or garden, outdoor projects are the clearest starting point for the holiday weekend. For homeowners looking to clean up the property before fall arrives, the right equipment can turn a time-consuming seasonal chore into a more manageable project. The Power Picks for yard focus on speed and reach before the season turns.
VEVOR Backpack Leaf Blower ($169.90) — High-Velocity Pick
Why it made the list: A High-Velocity Pick for tackling seasonal yard cleanup with less time and effort. Its 63cc two-cycle engine delivers air speeds of up to 220 MPH, giving homeowners the power to clear leaves and debris efficiently as they prepare their yards for fall.
What customers say: “This is a must buy can’t beat the price.” —— Jerry
What else you’ll reach for: VEVOR Battery-Powered Backpack Sprayer ($82.90).
Tailgate & Season Opener
For many Labor Day project planners, end-of-summer gatherings or football season are part of the weekend equation—turning the holiday into as much a social occasion as a project deadline. The Power Picks for this scene center the cookout.
VEVOR Portable Car Refrigerator ($309.90) — Versatility Pick
Why it made the list: A Versatility Pick for keeping food and drinks cold wherever the long weekend takes you—from the driveway to the tailgate. Its 50L dual-zone compressor design can hold up to 60 soda cans and operate from -4°F to 68°F, giving outdoor hosts and road-trippers a more flexible alternative to traditional coolers.
What customers say: “Game changer for road trips and camping!” —— Kristian Anderson
VEVOR Gas Griddle ($129.90) — Control Pick
Why it made the list: A Control Pick for taking the cooking outside when Labor Day gatherings move to the patio or tailgate. Its 22-inch cooking surface can handle up to 16 burgers at once, offering an easy way to cook for a crowd without a complicated outdoor setup.
What customers say: “You can cook anything on it and clean up is fast and easy. Stores great and the price was very reasonable.” —— Lydia B. Spiers
What else you’ll reach for: VEVOR Inverter Generator ($778.90), VEVOR Screen House Tent ($122.90), and VEVOR 8-Pack Landscape Path Lights ($90.90).
Garage reset
Garages, workshops and storage spaces were selected by 35% of surveyed project planners, making them another major Labor Day project area. The Power Picks for the garage cover three practical needs: organizing, repairing and installing.
VEVOR Storage Shelves ($110.90) — Value Pick
Why it made the list: A Value Pick for turning unused garage or workshop space into practical storage without a major investment. With five adjustable tiers and a total weight capacity of up to 3,000 pounds, it offers substantial storage capacity at an accessible price.
What customers say: “Great product, great price, I can’t say enough about VEVOR!” —— Steven
VEVOR Electric Car Jack ($117.90) — Heavy-Lift Pick
Why it made the list: A Heavy-Lift Pick for making routine vehicle maintenance more approachable—and turning a tire change into a manageable one-person job. The 5-ton electric hydraulic jack combines lifting, impact wrench and tire inflation functions in one setup, helping DIYers handle roadside or garage maintenance with fewer tools.
What customers say: “This jack is great. It is incredibly easy to use.” —— Keith MacWilliams
What else you’ll reach for: VEVOR Mechanics Tool Set and Socket Set ($143.90), VEVOR 3/8″ Drive Impact Socket Set ($49.90), and VEVOR Mechanics Stool ($59.90).
Deck day
As outdoor entertaining winds down for the season, decks and patios need refreshing. The Power Picks for this scene pair cleaning and refinishing—the two jobs that extend a deck’s life into next year.
VEVOR Gas Pressure Washer ($359.90) — Deep-Clean Pick
Why it made the list: A Deep-Clean Pick for tackling the heavier outdoor cleaning jobs that can stand between a worn surface and a refreshed space. With up to 3,600 PSI and a full-copper pump, it delivers the power needed to clean decks, fences, driveways and other outdoor surfaces.
What customers say: “This is by far, the best pressure washer I have ever owned.” —— G
VEVOR Stand Airless Paint Sprayer ($191.90) — Time-Saver Pick
Why it made the list: A Time-Saver Pick for making larger painting projects more efficient, with 650W power and up to 3,000 PSI for interior and exterior applications. Its stand-mounted design helps DIYers cover larger wood and metal surfaces more efficiently than traditional brush-and-roller methods.
What customers say: “Paint sprayers have come a long way and VEVOR’s price point was amazing.” —— Tammy Shaney
What else you’ll reach for: VEVOR Retractable Garden Hose Reel ($137.90).
From the backyard to the garage, the collection is built around one idea: match the tool to the project, and make the long weekend count.
“Power Picks is about starting with the work people want to get done and selecting only the products that truly earn a place on the list,” said Gavin Wu, Brand Director at VEVOR. “For each edition, we’ll look at real project needs and choose a focused set of tools and equipment with a clear reason behind every pick. Labor Day Edition marks the first Power Picks edition, with more project-focused selections to come at key moments throughout the year.”
This Labor Day, turn the project you’ve been putting off into the one you finally get done. Power Picks: Labor Day Edition matches the right tool to the right project—nothing more, nothing less. Explore the full edition at VEVOR and discover the project-based picks for the work ahead.
About the Survey
The Labor Day Home Improvement & DIY Survey 2026 was conducted by VEVOR via SurveyMonkey Audience among 529 U.S. adults age 18 and older with annual household incomes of $75,000 or more. The sample was weighted to U.S. census benchmarks on age and gender. Sample sizes vary by question because follow-up questions were shown only to relevant respondents. Results reflect the surveyed sample and should not be interpreted as nationally representative of all U.S. adults.
About VEVOR
VEVOR is a global home improvement brand built for Home Creators who want to upgrade their spaces with practical, high-performing products at exceptional value. From outdoor living and tools to home improvement equipment and everyday project essentials, VEVOR helps people take on upgrades with confidence, efficiency, and value. Today, VEVOR has supported over 30 million Home Creators worldwide, bringing performance, inspiration, and value to their home improvement projects.
Media Contact
VEVOR Communications Team
[email protected]
SOURCE VEVOR

Also from this source


